Cable crossing installed over Trishuli River to reconnect two Nuwakot wards
Key Points
- Kathmandu, September 1 A cable crossing has been installed over the Trishuli River to facilitate travel between Ward 1 and Ward 9 of Bidur Municipality in Nuwakot.
- The connection between the two wards was cut off following the devastating floods in the Bhotekoshi River on August 26.
- The cable crossing was installed on Tuesday morning...
SUMMARY LENGTH: ~55 WORDS
Read Full Story on Original Website →