Opening of track at Krishnabhir in final stage

Key Points
  • File Narayangadh, September 15 Efforts have reached the final stage to open a track as an alternative route for the damaged section of Krishna along the Prithvi Highway.
  • The roadway was blocked after a landslide.
  • Some vehicles passed through the track as a test run on Sunday.
  • With the successful test, preparation is being sped...
SUMMARY LENGTH: ~55 WORDS
Read Full Story on Original Website →