Work is underway to locate the entrance to the Trishuli-3A tunnel, says Nepali Army

Key Points
  • Kathmandu, August 30 The Nepal Army has said that work is underway to locate the entrance to the Trishuli-3A hydropower tunnel.
  • A joint team, which has been stationed there temporarily since August 28 for rescue operations, has been carrying out the work.
  • Currently, a team of 93 people, including experts, is working on-site.
SUMMARY LENGTH: ~55 WORDS
Read Full Story on Original Website →